The Quinn Group was formed in 1973 and is one of Ireland's most succesful companies. Since 2004, the Group has seen great expansion throughout Ireland and Europe. With the development of Quinn Environmental, The Quinn Group development a hightly controlled and regulated waste disposal facility at Lisbane, co. Armagh. Hence Edina was awarded the contract to supply 1 x 537kWE Landfill Gas Generator (Deutz TCG2016V12)
This project involved a full turn-key installation to design, supply, install, test and commission one new Landfill Gas Utilisation Plant including containerised 537kWe Landfill Gas Generator, containerised Blower Station and Flare, 415V/11kW Step-Up Transformer and 11 kV Switchgear at Lisbane Landfill Site, Tandragee, Northern Ireland.